Quality Control Protocols
Quality System Organization & Processes
Scroll and Click Category
-
Corporate / Central Quality – Mo Toumert
-
Core Strategy: Hybrid Quality Management
-
Owns the Quality Management System (QMS)
-
Approves company-wide procedures, standards, and KPIs
-
Manages escalations, audits, and major customer issues
-
-
Local Quality Control Offices
-
Engineers
-
Steve Sun (China)
-
Hai Thrinh (Vietnam)
-
Sheshadri Ravi (India)
-
-
Production Quality (BPI – DPI – FPI) FAI, PPAP, etc.
-
Metrology / Laboratory
-
Supplier Quality (SQE)
-
-
Responsibilities
-
Quality Director
-
Strategy
-
Compliance
-
Certification
-
-
Sourcing Office Quality Manager
-
Daily operations
-
Plant KPI,
-
Audit Readiness
-
-
Customer Quality Engineer
-
Customer interface
-
Complaints
-
-
-
-
Requirements Definition
-
Mechanical, Environmental, Chemical, Electrical Requirements
-
Customer Specifications (OEM Material Standards)
-
Legal Requirements (REACH, RoHS, IMDS)
-
-
Approved Material List (AML)
-
Only AML tied to engineering drawings & BOM can be used.
-
-
Material Validation
-
Material Certification
-
Lab Testing (mechanical, chemical, corrosion, UV, fatigue, etc.)
-
-
Change Control (ECN/PCN)
-
Any material change goes through engineering change management Full PPAP or partial PPAP
-
-
Certificate of Analysis (CoA) and FALR per batch
-
Material Identification & Traceability:
-
Barcodes
-
Heat Numbers
-
-
-
Customer Interaction Processes
-
Complaint Management
-
24h response → 8D process (D0–D8)
-
Root Cause Analysis (5Why)
-
Countermeasures with Verification & Validation
-
Documentation Uploaded to Customer Portals
-
-
Program Launch
-
Customer-Specific Requirements (CSR) Integrated
-
-
Documentation Flow
-
PPAP Submissions
-
Control Plans, FMEA, Test Reports
-
Customer Scorecards Monitored Monthly
-
Escalations Based on Thresholds (PPM, DPPM, Defects)
-
-
-
Communication
-
Regular Alignment Meetings with OEM Quality
-
Customer portals used to track actions and documents
-
-
-
Supplier Qualification
-
Supplier Self-Assessment + Risk Evaluation
-
On-Site Audit (IATF-based or VDA 6.3)
-
Financial & Capacity Assessment
-
Quality History Review (PPM, OTD, Corrective Actions)
-
Approval by Cross-Functional Team
-
-
Supplier Development & Contracts
-
Quality Agreement
-
Specifications & drawings submission
-
Clear expectations for:
-
PPAP
-
Packaging
-
Change Control
-
Traceability
-
-
-
First Article / PPAP
-
PPAP typically includes:
-
Dimensional Report
-
Material Certificates
-
PFMEA (Process Failure Mode and Effects Analysis)
-
Performance Tests (if appropriate)
-
-
-
Ongoing Supplier Monitoring
-
Incoming PPM
-
On-time Delivery
-
Audit Results
-
Response Time to SCARs
-
Supplier Ranking
-
Preferred Supplier List
-
-
Escalation Process
-
Levels include:
-
Level 0: Normal monitoring
-
Level 1: Corrective Action Required
-
CSL1 (Controlled Shipping Level 1) Supplier Performs Extra Inspection
-
New PPAP or requalification
-
Supplier exit in severe cases
-
-
-
-
Frameworks
-
PDCA Cycles
-
for improving administrative processes, supplier qualification, logistics coordination, documentation accuracy, and quality.
-
-
Standardized Work Improvement (SWI)
-
create consistent processes for inspection, documentation control, receiving procedures, customs clearance, warehouse handling,
-
-
Error-Proofing/Poka-Yoke
-
use error-proofing for Labeling and documentation SKU management Packaging verification Supplier mislabeling
-
-
-
Core CI Processes
-
Problem Solving
-
8D methodology
-
Cross-functional teams,
-
Root Cause Verified (with real data and validation)
-
Lesson Learned Documentations.
-
-
Internal Audits
-
System audits (IATF, ISO)
-
Process audits (VDA 6.3)
-
Product audits
-
Audit findings feed to CI plan
-
-
KPI Monitoring
-
PPM
-
Customer scorecards
-
-
Employee Training & Competency
-
Annual quality training
-
Problem-solving certification
-
-
Supplier Quality Improvement
-
PFMEA and control plan improvements
-
Annual supplier improvement roadmap
-
-
-